CITY REPORT MS

Beulah, MS Home Safety Data by ZIP

1 ZIP code · 0 water systems · Updated

Data: EPA SDWIS

1
ZIP Codes
0
Water Systems
N/A
ZIPs with Violations
Zone 3
Radon Risk (Low)
$81K
Median Home Value
$1,500
Est. Remediation (1.8% of home value)

Key Facts for Beulah Residents

  • Homes built before 1986: 44% - older plumbing may contain lead solder.
  • Estimated remediation: $1,500 per household.
  • CDC health risk index: 17.51 - above typical levels.

Overview

We track home safety data for 1 ZIP code in Beulah, Mississippi, covering 0 community water system serving approximately 310 people. The EPA snapshots used for this build directly map water systems to 0 of 1 ZIP codes.

EPA water-system violation data is unavailable in the dataset used for this page for the tracked ZIP codes in Beulah.

Lead & Copper

  • Lead data: not yet available for Beulah
  • Lead action-level status: not available

Radon Risk

Dominant radon zone: Zone 3 (Low Risk)

All ZIP Codes in Beulah

Data Sources

Reporting periods vary by source. Missing data is shown as unavailable, not as zero.

Beulah Community Health Snapshot

11.2%
Asthma (US: 9.8%)
20.5%
Diabetes (US: 10.4%)
18.6%
Poor Mental Health (US: 14.8%)

Source: CDC PLACES (County-level estimates). Water contamination can correlate with respiratory and chronic health conditions.

Compared to National Average

Asthma 11.2% ↑
Diabetes 20.5% ↑
Mental Health 18.6% ↑

Vertical line = national average. Above national · Below national

Beulah Infrastructure Age

1999
Median Build Year
44%
Built Before 1986
17%
Built Before 1970
Copper
Likely Pipe Material

With 44% of homes built before 1986, lead solder in plumbing is a potential concern. The EPA banned lead solder in 1986, but many older homes retain original plumbing.

Source: U.S. Census Bureau American Community Survey (ACS).

Housing Age Profile

Plumbing risk in residential housing tracks directly to construction era: pre-1986 homes may have lead-soldered copper joints; pre-1970 homes may have lead pipes outright. Beulah's median build year of 1999 places the city in a moderate risk zone where neither era dominates the housing inventory. Understanding which side of the 1986 threshold a specific property falls on - and whether it predates 1970 - is the most actionable starting point for a homeowner trying to assess their own tap water exposure.

1999
Median Year Built
44%
Pre-1986 (Lead Paint Risk)
17%
Pre-1970 (Lead Pipes Risk)
Pre-1970 (17%) 1970–1986 (27%) Post-1986 (56%)

Most homes in Beulah were built after 1986, reducing the risk of lead contamination from plumbing. Older homes should still be tested.

Source: U.S. Census Bureau ACS B25034.

How Remediation Costs Compare in Beulah

Looking at how documented remediation costs fit within Beulah property values, the equity share lands in the moderate tier - a finding that positions the household financial perspective between routine maintenance and a significant budget commitment, where most homeowners can successfully address documented issues by treating the expense as a planned financial priority rather than an unexpected one.

Median Home Value
$81,300
Est. Remediation
$1,500
Remediation as % of home value 1.8%

Remediation costs are moderate relative to home values in Beulah. The estimated $950–$2,400 range is manageable for most homeowners but still worth budgeting for. Home values are 36% below the Mississippi average.

Beulah: Lead Risk & Vulnerable Populations

44%
Homes Built Before 1986

Why children are most at risk: The CDC states there is no safe level of lead exposure for children. Children under 6 absorb lead more readily than adults, and even low levels can cause developmental delays, learning difficulties, and behavioral problems.

Routinely in Beulah, where 44% of housing predates the solder ban and aggregate utility readings hover near the federal threshold, a faucet-level draw functions as a standard household step for families with small kids.

Sources: EPA Lead and Copper Rule, U.S. Census Bureau ACS, CDC childhood lead poisoning prevention guidelines.

Beulah: NFIP Claim Records and Water-Quality Context

216
Total FEMA Flood Claims
$20,671
Avg Reported Sum With Payment Data
100%
A/V Share of Claim-Record ZIPs

Historical NFIP data for Beulah contains 216 flood insurance claims. Among claims with payment data, the average reported building, contents, and ICC component sum is $20,671. Among ZIP codes with claim records, 100% have an A- or V-family dominant rated zone recorded in those historical claims. This is not a complete current FEMA property-map inventory.

How flooding affects water quality: Flood events can introduce sewage, agricultural runoff, and industrial chemicals into water supplies. Even after floodwaters recede, contamination can persist in wells and aging infrastructure. The <strong>$1,500</strong> remediation estimate shown here excludes flood insurance and is not derived from NFIP claim count.

Claim count does not establish current property risk. Check the exact address in FEMA's current map and obtain a property-specific insurance quote when relevant.

Source: historical FEMA National Flood Insurance Program (NFIP) claim records. No current FEMA property-map designation is asserted.

Frequently Asked Questions

How much does it cost to fix water issues in Beulah?
Estimated remediation costs in Beulah average $1,500 per household, ranging from $950 to $2,400. Costs include filtration, pipe replacement, radon mitigation, and flood protection.
HomeCitiesMississippi → Beulah, MS

How to cite this page

APA ZipCheckup. (2026). Beulah, MS Home Safety Data by ZIP. https://zipcheckup.com/cities/ms/beulah/
BibTeX
@misc{zipcheckup-cities-ms-beulah,
  author = {{ZipCheckup}},
  title  = {{Beulah, MS Home Safety Data by ZIP}},
  year   = {2026},
  url    = {https://zipcheckup.com/cities/ms/beulah/}
}

Page version: August 2026.

Get safety alerts for Beulah, Mississippi

Free updates when EPA data changes for this area. No spam.

Unsubscribe anytime. Privacy Policy.

Share This Page

X Facebook
Check your water filter options Free tool - no phone call required.